Installing a new kitchen is one of the most exciting home improvement projects you can undertake. Whether you're opting for a professional installation or managing a DIY approach with dry-fit delivery, understanding the process from start to finish will help you prepare properly and set realistic expectations.
Before Installation Begins
Proper preparation is essential for a smooth installation. Several weeks before your fitter arrives, you should:
- Measure your space accurately. Provide detailed measurements of your kitchen area, including ceiling height, existing plumbing and electrical locations, and any obstacles like radiators or extractor hoods.
- Clear the work area. Remove personal items, decorations, and anything breakable from your kitchen. The installation team will need full access to work efficiently.
- Arrange access. Ensure your fitter can bring materials in easily. This may mean removing internal doors temporarily or arranging parking nearby.
- Disconnect appliances. If replacing existing appliances, arrange their removal beforehand (or confirm this is included in your fitting package).
- Address structural issues. If you notice water damage, uneven flooring, or other problems, discuss these with your fitter — they may affect installation.
Tip: Take photos of your current kitchen before work begins. These serve as reference points if any questions arise about the original state, and they're useful for your records.
The Installation Timeline
Most kitchen installations take 3–7 days depending on complexity. Here's what to expect:
Day 1: Removal and Preparation
Old kitchen units, appliances, and worktops are removed. The space is cleaned and prepared. Plumbing and electrical work may begin if major changes are needed.
Days 2–3: Base Units and Worktops
New base units are positioned, levelled, and secured. Worktops are fitted and sealed. Plumbing connections for sinks are made. This is often the noisiest phase.
Days 4–5: Wall Units and Appliances
Wall units are installed at correct height. Fitted appliances (oven, hob, extractor hood) are connected and tested. Electrical circuits are finished and certified.
Days 6–7: Finishing and Snagging
Splashbacks are fitted, handles and hardware are attached, final sealing is completed. A full check ensures everything works and looks perfect.
What to Expect During Installation
Noise and Disruption
Kitchen fitting is noisy. Expect sounds from power tools, particularly on days 1 and 3. Dust will be present despite precautions. Professional installers minimise this, but some disruption is inevitable.
Temporary Loss of Facilities
Your kitchen will be unusable during installation. Plan alternative arrangements for cooking, washing up, and storing food. Many people use a microwave and kettle in another room during this time.
Site Conditions
Your fitter will maintain reasonable working conditions, but the space will be cluttered with packaging, tools, and materials. They'll clear rubbish regularly, but keeping the area tidy is challenging during active work.
Unexpected Issues
Sometimes installation reveals problems — water damage behind old units, uneven walls, or plumbing that doesn't connect as expected. Good fitters are experienced at problem-solving, but issues may add a day or require additional cost.
Your Responsibilities During Installation
- Provide access. Ensure the team can access your home on schedule. Leaving keys with a trusted neighbour is helpful if you need to go out.
- Offer refreshments. A kettle for tea and coffee is appreciated — it keeps morale high and work efficient.
- Communicate issues promptly. If something doesn't look right or you have concerns, mention it immediately rather than after work is completed.
- Don't interfere with work. Let the professionals work without interruption. Asking questions is fine, but hovering can slow progress.
- Plan around the work. Arrange alternative arrangements for cooking and washing. Keep the kitchen as clear as possible.
Pro tip: Keep a notepad nearby. If you notice anything you'd like adjusted, write it down and discuss once the main work is complete. This helps the fitter prioritise finishing tasks.
Plumbing and Electrical Work
Most kitchens require some plumbing and electrical changes. Your fitter should confirm:
- All electrical work meets current building regulations (Part P)
- Electrical circuits are tested and certified before completion
- Plumbing is pressure-tested and all connections are secure
- Gas (if applicable) is fitted by a Gas Safe registered engineer
- Warranties cover all work performed
Professional installers carry appropriate insurance and hold relevant certifications. Always request proof before they start work.
After Installation is Complete
The Final Inspection
Before your fitter leaves, do a thorough walk-through together. Test every cupboard, drawer, tap, hob ring, and appliance. Note any snagging — minor adjustments like handle alignment or small gaps that need filling.
Paperwork
You should receive:
- Electrical certification for any new circuits
- Plumbing certification if required
- Guarantees on appliances and work performed
- Instruction manuals for your new appliances
- Invoice and receipt
The Snagging Period
Most fitters allow a few days for minor adjustments. If issues arise, contact them promptly. Small tweaks are usually included in the service; major rework may involve a call-back charge.
Common Installation Mistakes to Avoid
- Skipping preparation. Rushing into fitting without addressing underlying issues (water damage, uneven walls) creates problems later.
- Choosing based on price alone. The cheapest quote often means corners cut or inexperienced work. Quality matters in kitchens.
- Not getting it in writing. Ensure your contract specifies exactly what's included, the timeline, payment terms, and what happens if issues arise.
- Over-complicating the design. Simpler layouts install faster and have fewer problems. Complex custom work needs experienced hands.
- Ignoring ventilation. Proper extractor hood installation is critical. Poor ventilation leads to condensation and long-term damage.
Dry Fit vs Full Installation
If you've chosen dry-fit delivery, your kitchen units arrive positioned but not permanently installed. This approach:
- Costs less upfront — you arrange fitting separately
- Gives you flexibility to manage work on your schedule
- Works well if you have a trusted local fitter already
- Requires you to coordinate between delivery and installation
For dry fit, ensure you arrange installation quickly after delivery to avoid having your kitchen immobilised for weeks.
Final Thoughts
A well-executed kitchen installation transforms your home and provides years of enjoyment. By choosing a professional, preparing properly, and maintaining clear communication throughout, you'll ensure the process runs smoothly. Recycled kitchens offer excellent value, and with proper installation, they perform just as well as brand new alternatives at a fraction of the cost.
When you're ready to move forward with your kitchen project, our team can arrange professional fitting through our trusted network of experienced installers across Cornwall.
Ready to install your recycled kitchen?
Browse our gallery of available kitchens and get a fitting quote today.
Browse Kitchens Get a Quote